Engineering & Layout
3D planning and equipment arrangement supporting coordination of the engine hall and associated systems.
A completed BOT project using nine 4 MW MWM TCG 2032 V16 units. Pasargad currently operates and maintains the plant for the client.
Real project photographs are arranged as a sequence showing engineering layout, site preparation, equipment delivery, positioning and system integration.
3D planning and equipment arrangement supporting coordination of the engine hall and associated systems.
Part of the infrastructure and civil works completed before the principal generating equipment was positioned.
MWM generating equipment arriving at the project site ahead of unloading and positioning.
Controlled lifting and movement of the unit toward its installation position within the plant structure.
The generating unit positioned within the structure while surrounding installation work continued.
Progressive completion of piping and mechanical systems surrounding the generating units.
Auxiliary equipment and supporting systems integrated around the main generation platform.
A view of the MWM unit arrangement after substantial installation and plant-integration work.
A limited selection of clear photographs directly documenting installed equipment, mechanical auxiliaries, control checks and maintenance activity.





This section is limited to information supported by the current project file and photographic archive.
Nine natural-gas MWM TCG 2032 V16 generating units, rated at 4 MW each, form a 36 MW industrial power plant in Bardsir, Kerman.
Delivered under a BOT model and completed in 1402 SH, the plant is currently operated and maintained by Pasargad for the client. The photographic record covers engineering, delivery, positioning and plant integration.