Survey & level control
Existing conditions and working elevations checked against the access road, adjacent substation and surrounding site.
An ongoing turnkey EPC project based on fourteen 3.4 MW Jenbacher J620 generating units. The present record covers survey control, site preparation and foundation excavation.
The current record documents activities completed or underway at the photographed stage of the project.
Existing conditions and working elevations checked against the access road, adjacent substation and surrounding site.
The production-hall workfront graded and prepared for excavation and machinery access.
Generator and structural foundation positions set out and excavated across the production-hall area.
Excavator mobilization, soil removal and delivery of purchased reinforcing steel coordinated with the civil-work programme.
A concise selection of clear, project-specific photographs. Other similar or lower-value images remain in the internal archive.
Survey of the site and adjacent conditions, including the access road, nearby electrical substation and relevant elevation changes.
Excavation and loading undertaken together to keep the civil-work area accessible and ready for the next operation.
Generator and structural foundation boundaries transferred to the site from the verified survey control.
Excavation progressing across the production-hall area and the locations assigned to generating-unit foundations.
Overall view of the excavated trenches before dimensional, positional and elevation checks for the next foundation activities.
The record will continue to develop as construction and equipment installation advance.
The approximately 48 MW plant comprises fourteen project-rated 3.4 MW Jenbacher J620 generating units.
Turnkey EPC delivery is underway. The present stage includes surveying, level control, site grading, production-hall excavation and generator-foundation preparation.